This website is designed & managed by CBS Consulting (NI) Ltd
J.W. Kane Precision Engineering, Portadown
New build 30,000 sqft factory for aviation machine manufacturer.
Project included factory facility, offices & staff accommodation.
Servicing requirement included air sampling fire alarm system, gas heating and hot water systems, fire & intruder/CCTV services and LV/HV mains electrical distribution.
Project Value: Approx £1m Status: Complete
CM Machinery, Portadown
New build 25,000 sqft factory for light engineering works.
Project included factory facility, offices & staff accommodation.
Servicing requirements included gas heating and hot water systems, fire & intruder/CCTV services and LV/HV mains electrical distribution.
Project Value: Approx £950k Status: Complete
Private House & swimming pool building, Hillsborough
Extension and complete renovation of existing property to provide 7 bedroom home incorporating home automation systems, geothermal heating system & solar hot water system.
Project included separate swimming pool building with jacuzzi, and heat recovery system.
Project Value: Est £850k Status: Complete
The Market Bar, Dromore
Extension and renovation of existing property to provide extensive bar areas with authentic period detailing, off licence & lettable office accomodation. Project incorporates complete heating and future air conditioning via ventilation system and incorporation of extensive LED technology.
Project Value: Est £450k Status: Complete
Image Coming
Soon
SW Acute Hospital, Enniskillen
CBS Consulting was appointed along with other sub-consultants to co-ordinate Mechanical & Electrical Services for a 5 storey
ward & clinical services block of this fast track exemplar PFI Project.
Project Value: £267m Status: Phase Complete
Emerson's Supermarket Armagh
CBS Consulting was appointed to design replacement boiler plant and improve energy efficiency. A range of phased projects included voltage optimisation and heat recovery from chiller plant to provide heating for a new auite of offices. A further heat recovery installation is now at design stage to provide heating to the retail area.
Project Value: £30k Status: Phases 1 & 2 Complete
Image Coming
Soon
GAA & Football Pitch Floodlighting Design
CBS Consulting has carried out electrical design for a number of sports pitch floodlighting installations throughout Ireland including the GAA Tyrone Centre of Excellence.
Many of the projects received public funding through 'Sport NI' grant incentives.
Project Value: Over £2m Status: Completed & Ongoing
St Louis Secondary School, Carrickmacross
CBS Consulting worked in conjunction with another M&E consultancy to design and tender and oversee completion of replacement emergency lighting, fire alarm installations and replacement switchgear within a 8 week timeframe.
Project Value: €150k Status: Complete
St Malachy's Primary School, Bangor
CBS Consulting was appointed to provide M&E Consultancy Services for a 3 storey extension to an existing primary school including all heating, ventilation, lighting, plumbing & protective services installations.
Project Value: £130k Status: complete
St Comgall's Parish Centre, Bangor
CBS Consulting was appointed address heating issues in the main hall area as fuel bills were high but heating poor. The system was found to be lacking the required controls and safety provisions. The control system designed by CBS now heats the space effectively and has improved efficiency by over 70%.
Project Value: £7.5k Status: Complete
St Comgall's Parish Centre, Bangor
CBS Consulting was appointed address heating issues in the main church area as fuel bills were high but heating poor. Following detailed design a conversion from oil to high efficiency condensing gas boilers was put in place within a 1 week time frame (including underground gas services). This forms the first stage of an eventual underfloor heating installation in the building.
Running costs are estimated to drop by 40% whilst the building can now be comfortably heated at all times.
Project Value: £8.5k Status: Complete
Radius Plastics, Derbyshire & Lurgan
CBS Consulting has been appointed to undertake redesign of existing 11kV high voltage infrastructure for 2 large sites operating 24/7 plastic moulding and extrusion services. The project is to facilitate merging of local facilities with strict deadlines and contingency services to minimise downtime.
Project Value: £7.5k Status: Phase Complete
Douglas & Grahame, Carrickfergus
CBS Consulting was tasked with improving energy efficiency at the UK's leading brand house supplying Men and boys contemporary fashionwear. Savings of up to 30% in gas usage have been achieved through improved boiler controls and electricity usage on the site reduced from 2-4% for 'zero' investment. Trials are now underway on energy efficiency maintenance free warehouse lighting and we are investigating the viability of renewable technologies for use on the site.
Project Value: TBC Status: Complete
Open Door Housing Association
CBS Consulting was appointed to provide M&E consultancy services for design of intercom, fire alarm & emergency lighting installations in addition to heating system design for a number of Open Door sites in Belfast & Portadown
Project Value: Approx £150k Status: Complete
Image Coming
Soon
Quay Gate House, Belfast
CBS Consulting was appointed to carry out a survey on problems with the existing heating systems within the building. A detailed report was compiled illustrating the findings with outline recommendations.
A design tendering and works exercise will now be carried out to implement those recommendations
Project Value: Approx £ TBC Status: In Progress
'We Make' cafe and restaurant, Junction One, Antrim
CBS Consulting was appointed to carried out an energy efficiency survey to identify means of reducing electricity usage.
A number of proposals were made with potential savings of up to 40% in electricity usage. The first phase incorporating low energy LED lighting and high efficiency fluorescent lighting is complete reducing lighting energy usage by approximately 75% with a 10-20% increase in levels over original levels.
Project Value: Approx £ TBC Status: Phase Complete
Image Coming
Soon
Image Coming
Soon
Image Coming
Soon